Project MR533/TJ000201/GLM – Activities completed for January 2008 (25 days)
1. The building of the channel for supplying water from Hudoykul channels to Dariyakul Lake.
a) The transportation of an excavator on a trailer – the distance - 60 km; duration - 2 days; b) The work on construction of the channel - a distance – 0.4 km; duration - 15 days; c) The repair and preventive maintenance of the special technology (the cable changing, directing the roller and other things.) - Duration - 5 days; d) Delivery of repair equipment – a distance - 400 km; duration - 1 day; e) Transportation of technical staff to place of the work and back - the distance 15 km (daily), the total 300 km; f) The supply of GSM to the place of the work (6 deliveries) – the distance 30 km, total - 180 km. |
|
|
| Статьи |
|
| Опрос |
| Готовы ли Вы участвовать в развитии проекта? |
|
| Отчеты |
|
| Скачать файлы |
|
| Вид из космоса |
|
|
|